This double deck was supported by notched 4 X 4. Rotted on the bottom of 4 of the 6 posts and sagging on one side. It was jacked up and supported below with 8 X 8. New leadger on the top deck to straighten the sag. New hand rails, stairs and repaired all infested boards.